H05V-R H07V-R Copper PVC Insulated Building Wire
Application
H05V-R/H07V-R wires are mainly used for indoor, cable ducts, industrial plants or conversion stations, and underground installations. Can be used for distribution boards and panels, or equipment that requires a large number of wire strands.
Constrution
Characteristics
Operating voltage | 300/500 V(H05V-R) |
Operating voltage | 450/750 V(H07V-R) |
Test voltage | 2000 V(H05V-R), 2500 V(H07V-R) |
Dynamic bending radius | 15 x Ø |
Static bending radius | 15 x Ø |
Operating temperature | -5º C to 70º C |
Static temperature | -30º C to 80º C |
Temperature reached in short circuit | 160º C |
Flame retardant | IEC 60332.1 |
Insulation resistance | 10 MΩ x km |
Standards
International: IEC 60227
China: GB/T 5023-2008
Other standards such as BS, DIN and ICEA upon request
Parameters
Cross Section |
Conductor Construction |
Insulation Thickness |
Overall Diameter Max |
Min Insulation Resistance |
Weight Approx |
(mm2) |
(No/mm) |
(mm) |
(mm) |
(ohm/Km) |
(Kg/Km) |
1x0.75 |
7/0.97 |
0.6 |
2.8 |
0.012 |
11 |
1x1.0 |
7/0.43 |
0.6 |
3 |
/ |
14 |
1x1.5 |
7/0.52 |
0.7 |
3.4 |
0.01 |
21 |
1x2.5 |
7/0.67 |
0.8 |
4.2 |
0.009 |
32 |
1x4 |
7/0.85 |
0.8 |
4.8 |
0.008 |
45 |
1x6 |
7/1.04 |
0.8 |
5.4 |
0.007 |
65 |
1x10 |
7/1.35 |
1 |
6.8 |
0.007 |
110 |
1x16 |
7/1.70 |
1 |
8 |
0.005 |
165 |
1x25 |
7/2.14 |
1.2 |
9.8 |
0.005 |
264 |
1x35 |
7/2.52 |
1.2 |
11 |
0.004 |
360 |
1x50 |
19/1.78 |
1.4 |
13 |
0.005 |
490 |
1x70 |
19/2.14 |
1.4 |
15 |
0.004 |
685 |
1x95 |
19/2.52 |
1.6 |
17.5 |
0.004 |
946 |
1x120 |
37/2.03 |
1.6 |
19 |
0.003 |
1181 |
1x150 |
37/2.25 |
1.8 |
21 |
0.003 |
1453 |
1x185 |
37/2.52 |
2 |
23.5 |
0.003 |
1821 |
1x240 |
61/2.24 |
2.2 |
26.5 |
0.003 |
2383 |
1x300 |
61/2.50 |
2.4 |
29.5 |
0.003 |
2983 |
1x400 |
61/2.85 |
2.6 |
33.5 |
0.003 |
3800 |
FAQ
Q: Can we have our logo or company name to be printed on your products or the package?
A: The OEM & ODM order is warmly welcome and we have fully successful experience in OEM projects. What's more, our R&D team will give you the professional suggestions.
Q: What’s the payment terms?
A: 30% T/T deposit, 70% T/T balance payment before shipment.
Q: How does your factory do regarding quality control?
A: We have a strict quality control system, and our professional experts will check the appearance and test functions of all our items before shipment.
Q: How can I get a sample to test your quality?
A: We can provide free samples for your test and checking, just need to bear the freight charge.