what is the correct photovoltaic cable installation guide? With the rapid development of renewable energy, photovoltaic power generation systems have been widely used in various fields.

As an important part of the photovoltaic power generation system, the installation quality of photovoltaic cables is directly related to the stability and safety of the system.

The following will introduce the installation steps and precautions of photovoltaic cables in detail to help you complete the installation work better.

 微信图片_202406181512013

Choose the appropriate cable model and specification

 

Before installing the photovoltaic cable, you must first choose the appropriate cable model and specification according to the scale and needs of the photovoltaic power generation system.

The selection of the cable should fully consider its current carrying capacity, weather resistance, UV resistance and other properties to ensure that the cable can operate stably for a long time in an outdoor environment.

At the same time, the rated voltage of the cable should meet the operating voltage requirements of the system to avoid safety problems caused by excessively high or low voltage.

 

Reasonable planning of cable layout

 

Cable layout is a key link in the installation process of photovoltaic cables. Reasonable planning of cable layout helps reduce line losses and improve power transmission efficiency. When planning the layout, the following principles should be followed:

 

Try to minimize the cable length and reduce line loss;

 

The cable should avoid passing through high temperature, humid, and easily damaged areas to maintain the good performance of the cable;

 

The cable should maintain a certain bending radius at the bend to avoid excessive bending that may cause cable damage;

 

The cable should be firmly and reliably fixed to avoid shaking in natural environments such as wind and rain.

 636034060293773318351

Detailed explanation of cable installation steps

 

Wire stripping: Use wire strippers to strip a certain length of insulation at both ends of the cable to expose the conductor part.

The stripping length should be determined according to the size and requirements of the terminal to ensure that the conductor can be fully inserted into the terminal.

 

Terminal crimping: Insert the stripped cable conductor into the terminal and use a crimping pliers to crimp. During the crimping process, ensure that the conductor is in close contact with the terminal without looseness.

 

Fix the cable: In the direction of the photovoltaic cable, use a cable clamp or fixing to fix the cable to the bracket or wall. When fixing, ensure that the cable is in a horizontal or vertical state to avoid excessive bending or stretching.

 

Connecting equipment: According to the design requirements of the photovoltaic power generation system, connect the photovoltaic cable with photovoltaic modules, inverters, distribution boxes and other equipment.

During the connection process, ensure that the connection is tight, without looseness or poor contact. For the connection parts that need waterproofing, waterproof tape or waterproof joints should be used for sealing.

 微信图片_202406181512023

Precautions

 

During the installation process, the cable should be avoided from contact with sharp objects to prevent scratches. At the same time, the cable should be kept clean to avoid dust, oil and other pollutants adhering to the surface of the cable.

 

When connecting the cable, ensure that the connection is tight and reliable to avoid looseness or falling off to cause electrical failure. After the connection is completed, the connection parts should be checked to ensure that there are no abnormalities.

 

When working at high altitudes, safety belts should be worn to ensure the personal safety of construction workers. At the same time, avoid installation work under bad weather conditions to ensure construction quality and safety.

 

After installation, the photovoltaic cable should be tested for insulation to ensure that the insulation performance of the cable meets the requirements. At the same time, the cable should be inspected and maintained regularly to promptly discover and deal with potential safety hazards.

 